- Table of Contents
- Purpose
- Objective
- Reference
- Responsibility
- Instrument Description & Identification
- Installation Check List
- Major Components
- Utilities
- Standard Operating Procedure
- Calibration Procedure
- Installation Verification
- Summary of Installation Qualification
- Certification Statement
- Qualification of the unit installation and examination of all background information is performed to assure conformance to Pharmanova Malawi Limited and the manufacturer's specifications.
- The Instrument meets the current regulatory requirements.
- No unauthorized or unrecorded modifications have taken place.
- Standard Operating Procedures (SOP), Calibration Procedures, and Checklist have been identified and listed.
- All critical instrumentation has been identified.
- All utilities are properly connected.
- All test reports, drawings, and manuals, are available and maintained
- The validation officer/ QC Assistant Manager shall be responsible for installation.
- QA Manager shall conclude and approve the results
Manufacturer | : | Shimadzu |
Instrument Name | : | Fourier Transform Infrared Spectrophotometer |
Instrument ID | : |
|
Model Number | : | IR Affinity-1S |
Serial No | : |
|
Purchase Order Number | : |
|
Date Received | : |
|
Date Installed | : |
|
Sr. No | ITEM |
1 | Instrument Appearance Check |
2 | Parts Check |
3 | Installation Site Check |
Sr. No | Items | Observation | Checked by | |
1 | Instrument Appearance Check |
|
| |
2 | Parts Check |
|
| |
3 | Installation Site Check | |||
| a. Dry and indoors |
|
| |
| b. Away from draughty or hot equipment like fans or heater |
|
| |
| c. Within reach of PowerPoint |
|
| |
| d. Away from potential sources of interference, such as RFI-generating equipment |
|
| |
| e. Not to use a power circuit that also has large motors |
|
| |
| f. Away from direct sunlight |
|
|
Description | Specified | Checked By |
Make | Shimadzu |
|
Model No | IR Affinity-1S |
|
Sr. No |
|
|
Dimensions | ||
Width | 514 mm |
|
Height | 273 mm |
|
Depth | 606 mm |
|
Weight | 30 kg |
|
Installation Consideration | Yes / No |
|
Properly Mounted, Supported & Connected | Yes / No |
|
Properly Labeled / Identified | Yes / No |
|
Supply voltage | AC 100 - 240 V |
|
Frequency | 50/60 Hz |
|
Power consumption | 150 VA (at used), 4VA (at standby) |
|
- Login to the computer using your ID and password.
- Turn on the FTIR machine (the power button is in the front)
- Start IRSolution software. Start -> All Programs -> IRSolution
- A window may pop up asking to remove marked data. Click yes.
- Another window may pop up saying “Auto adjust required. Perform auto adjust now?” Click yes. a. This may take several minutes
- On the top toolbar, click on Measurement -> EasyScan
- A window will pop up with some options. Typically, nothing needs to be adjusted, but you can select the range of wavenumbers scanned (in cm-1).
- Name the data file and add any comments. Then click ok.
- It will ask to execute BKG (background) measurement. Click yes.
- It will ask to execute BKG measurement again. Click no.
- Now it is time to place the sample in front of the beam. There is a triangular sample holder that can be used. Tape can also be used to hold the sample in front of the beam. (The beam is red; make sure it is going through the part you want to test).
- Once the sample is in place, close the chamber and click ok. The spectrum will be acquired
- It will ask “Are you all right?” Click ok.
- Save the XPS file if desired. It contains the spectrum and lists peaks in a table.
- Now, you can export the data to a text file for use in Excel or other software if desired. File -> Export. Save as (ASCII) which will make a .txt file.
- See the figure below to see what the screen should look like.
- A peak or spectrum search can now be performed by clicking on search. It is recommended to try both as one may find a better match than the other.
- The Y-Axis can be changed to absorbance or % transmission by clicking Graph -> Y-axis mode -> Tra or Abs
- The blue – red = green button (circled in the image below) will put both the acquired spectrum and the matched spectrum on the same graph.
- When finished
- Log off
- Close the software
- Remove the sample
- Turn off the power
- Ensure that the FTIR System is placed on a clean and dust-free platform.
- Ensure that the instrument has been connected to power supply. Ensure that the all communication cords between the units are connected properly.
- Dry indicator checks; the check must be done before turning the instrument ON. There are two indicators – an orange lamp as Dry indicator and green lamp as Power indicator on the front. Dry indicator light shows the humidity in the interferometer of the FTIR even if it is off. Always confirm that the Dry indicator is on.
- Silica gel check; this check must also be done before turning the instrument ON.
- Power spectrum check; this is done by clicking [BKG Scan] icon to perform background scan measurements. A power spectrum is displayed after scanning.
- Click the [Data] tab and then set scan parameters such as the number of scans and resolution.
- Enter a filename and sample information as “polystyrene film” and save in a specific folder as “Calibration of FTIR”.
- Insert in the polystyrene film provided in the sample chamber cassette of the FTIR and start measurements.
- A typical spectrum of polystyrene will appear.
- Check the instrument for the following parameter and record the results in the calibration sheet.
- Wave no accuracy
- Resolution
Sr. No | Consideration | Yes/No | Checked By |
1. | Major components are securely anchored and protected from shock |
|
|
2. | There is no observable physical damage |
|
|
3. | Sufficient room for servicing provided |
|
|
4. | Required electrical connections are tight and weather proofed and grounded |
|
|
5. | Instrument identification nameplate is visible |
|
|
6. | Unit installed and secured in place as per manufacturer recommendations |
|
|
Sr. No | Description | Yes/No | Checked By |
1. | All acceptance criteria set forth in the Installation Qualification was met |
|
|
2. | All specifications verified |
|
|
3. | Deviations if any |
|
|
| Signatories | Signature | Date |
Executed by | Quality Control |
|
|
Reviewed by | Quality Control |
|
|
Approved by | Quality Manager |
|
|