Section No. | Description |
1 | Title |
2 | Objective |
3 | Scope |
4 | Re – qualification criteria |
5 | Overview of equipment's / Description |
6 | Definition |
7 | Responsibilities |
7.1 | Quality Engineering |
7.2 | Quality Assurance |
7.3 | Quality Control |
7.4 | Purchase |
7.5 | Production |
7.6 | Engineering |
8 | Indented use of the instrument |
9 | Acceptance Criteria |
10 | Reference |
11 | Installation Qualification |
12 | Standard Operating Procedure |
13 | Operation Qualification |
14 | Performance Qualification |
15 | Preventive Maintenance Schedule |
16 | Final Conduction and recommendations |
- When there is the change in the location of the equipment.
- When there is major modification in the equipment.
- When there is major breakdown, which have direct impact on the performance of the equipment.
- Installation Qualification: A document verification of the installation in the selected user environment to comply with the approved design, the manufacturer’s recommendations and or user requirements.
- Operation Qualification: A document demonstrating that facilities and operations work to functional design specifications.
- Performance Qualification: A document verification of the performance in the selected user environment to comply with the approved design, the manufacturer’s recommendations and or user requirements.
- Preparation, approval and implementation of the protocol.
- On going compliance of the system.
- Organizing the activities related to qualification.
- Co – ordination with production, engineering purchase department.
- Qualification reports preparation.
- Review, monitoring and approval of the protocol.
- On going compliance of the quality system.
- Analysis of samples if any.
- Recording the QC raw data.
- Organization Preparation, approval and implementation of the protocol.
- Purchase order preparation.
- Co-ordination with vendor for related activities.
- Organizing the activities related to qualification in production area.
- SOP preparation for operation.
- Routine calibration and maintenance implementation.
- Report review and training of users.
- Providing the design specification.
- Inspection at vendor site.
- Utilities arrangement for equipment.
- Organize the calibration of parts of equipments & instruments as a whole.
- Organizing the activities related to qualification.
- Equipment shall be supplied and installed as per pre – determined specification Purchase Order.
- Material of construction and finish surface of equipment shall be as per pre – determined specification.
- All Utilities connected with the equipment shall be as per requirement.
- All components of the equipment shall work or function as defined.
- Equipment shall perform for its intended use as specified.
Equipment Name | Dust Extractor Machine | Equipment Type |
|
|
| Location (Floor) |
|
Designed By |
| Location (Plant) |
|
|
| Date of Installation |
|
Sr. No. | Description | Specification | Actual | Remarks |
1 | Chamber | SS 316 |
|
|
2 | Impeller | CIP MAKE |
|
|
3 | Cotton Bag | CIP MAKE |
|
|
4 | Motor | 1 Hp |
|
|
5 | Wheel | Pu |
|
|
Sr. No. | Utilities recommended by the vendor | Specification | Utility connected with the equipment | Remarks |
1 | Electrical | 1 Hp, 3 phase |
|
|
2 | Chilled water | NA |
|
|
3 | Cooling water | NA |
|
|
4 | Hot water | NA |
|
|
5 | Compressed air | NA |
|
|
6 | Steam pressure | NA |
|
|
Installation Checks:
Sr. No. | Test | Test Procedure | Observation |
1 | Position as per GA drawing | Ensure that position of equipment is as per the GA drawing |
|
2 | Electrical connection | Check 3 phase supply to starter through a proper isolator with suitable backup MCBs. |
|
3 | Direction of Motor | Check direction of motor depending upon suction |
|
4 | Earthing | Check the earthing of machine |
|
Installation Done By: Verified By:
ALSO READ: Performance Qualification Protocol for Compressed Air System
Area Representative | Signature | Date |
Production |
|
|
Engineering Services |
|
|
Quality Engineering |
|
|
Quality Assurance |
|
|
Standard Operating Procedure:
Draft SOP of the equipment shall be available
SOP No. | Title | Location | Effective Date | Revision No. | Remarks |
1 |
|
|
|
|
|
2 |
|
|
|
|
|
3 |
|
|
|
|
|
Sr. No. | Activity | Specification | Observation | Remarks |
1 | On / Off Test | Machine should be ON and OFF with operating buttons |
|
|
3 | Start Machine with proper suction direction | Smooth running |
|
|
4 | Test for vibration | No abnormal vibration |
|
|
5 | Test for noise | No abnormal Noise should be there. |
|
|
6 | Stopping of the Machine | Machine should STOP |
|
|
Sr. No. | Safety features provided with the equipment | Method of Verification | Target | Actual | Remarks |
1 | Proper earthing to the machine | Ensure that there is no loose earthing | Complete earthing |
| |
2 | Safety interlocks if any | Should work as designed | No deviation |
|
Name | Designation | Date of Training | Trained by |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area Representative | Signature | Date |
Production |
|
|
Engineering Services |
|
|
Quality Engineering |
|
|
Quality Assurance |
|
|
Sr. No. | Activity | Functional Acceptance Criteria | Status / Observation |
1 | Proper assembly of cotton bags | As per the details given with the operating manual |
|
2 | Position of chamber | It should be properly fixed with machine and fixed with knobs. |
|
3 | Powder suction | It should be from the specific machine with this machine to be attached. |
|
Name of Tablet:
Performance Criteria - Before Connecting This Machine:
1. Appearance:
2. Analysis
Performance Criteria - After Connecting This Machine:
| 1 | 2 | 3 |
Appearance |
|
|
|
Analysis |
|
|
|
Area Representative | Signature | Date |
Production |
|
|
Engineering Services |
|
|
Quality Engineering |
|
|
Quality Assurance |
|
|
Preventive Maintenance Schedule:
Sr. No. | Preventive maintenance details | Any major change | Performed by | Remarks |
|
|
|
|
|
Change in the History card:
New equipment installed on: Date -
Sr. No | Change recommended by | Reason for change | Modification Details | Re-qualification | Remark |
|
|
|
|
|
|
Area Representative | Signature | Date |
Production |
|
|
Engineering Services |
|
|
Quality Engineering |
|
|
Quality Assurance |
|
|