Installation Qualification for Particle Size Analyser (Malvern Instruments)

TABLE OF CONTENTS
  1. Protocol Author
  2. Protocol Pre – Approval
  3. Validation Team
  4. Objective & Scope
  5. Acceptance Criteria
  6. Responsibilities
  7. Criteria For Clearance to Installation Qualification
  8. Reference Documents
  9. Installing Software
  10. Installing Machine in Software
  11. System Description
  12. Major Component List
  13. Identification of Instruments to be Calibrated
  14. Check For Installation Qualification
  15. SOP Identification
  16. Preventive Maintenance Programme
  17. Change Parts and Spare Parts
  18. Safety Features Identification
  19. Requalification Criteria
  20. Deficiency and Corrective Action Report
  21. Summary & Conclusion
  22. Installation Qualification Post – Approval
  23. Appendix


1. PROTOCOL AUTHOR

Name

Designation

Signature

Date

 

 

 

 


2. PROTOCOL PRE–APPROVAL

Name

Designation

Signature

Date

 

 

 

 

 

 

 

 

 

 

 

 


3. VALIDATION TEAM: 
Validation team will comprise of representatives form Q.C., Q.A and Malvern.

Function

Name

Signature

Date

 

 

 

 

 

 

 

 

 

 

 

 



4. OBJECTIVE & SCOPE:
4.1 Objective
The objective of this protocol is to establish documented evidence that
  • The equipment is installed according to the design specification and manufacturer’s recommendation.
  • Each installed subcomponent complies with the specifications.
  • SOP’s have been identified and listed.
  • All critical instrumentation have been identified for calibration.
4.2 Scope
This installation qualification protocol defines the procedure, checklists, references, acceptance criteria and requalification criteria used in the successful installation of the equipment.

5. ACCEPTANCE CRITERIA
  • The equipment shall be installed as per the supplier’s recommendation.
  • The installation shall be performed in the close supervision of the validation team.
  • All checks of installation qualification shall be found to be in accordance with the desired requirement as mentioned in the specifications for the equipment.

6. RESPONSIBILITIES
  • Protocol Development: Representative of Malvern in close co ordination with Q.C. and Q.A. shall develop the protocol.
  • Qualification Program: This has been jointly carried out by Q.C., Q.A. & Representative of Malvern.
  • Approval of Protocol & Evaluation of Results for Final Approval: The Q.C Head and Q.A Head will evaluate the results and are authorized for final approval.


7. CRITERIA FOR CLEARANCE TO INSTALLATION QUALIFICATION

7.1 Purchase Order Copy (Annexure)

PARAMETERS

REQUIREMENT

OBSERVATION

CHECKED BY

DATE

® A copy of the duly raised purchase order

 

® Check the list of accessories and spares

Should be available

 

As per purchase order

 

 

 


Any deviation from the purchase order should be informed to supplier through the purchase department for corrective action.

7.2 Details of the Equipment
Equipment Name: PARTICLE SIZE ANALYSER
Vendor’s Name: MALVERN. 
Location of the Equipment: INSTRUMENT ANALYSIS ROOM


7.3 Installation Procedure
Installation of the equipment should be carried out as under :

PARAMETERS

CHECKED BY

DATE

Machine shall be received from the vendor at the factory. All details of delivery shall be checked.

 

Machine shall be then shifted to the location where it has to be installed in Q.C. department.

 

Validation team in the presence of a person from the supplier shall perform installation qualification of the equipment.

 

Utilities should be identified and then connected to the equipment.  

 

 


7.4 Clearance for Installation Qualification
All the criteria for the acceptance of the equipment for performing of installation qualification have been met.

The equipment is now ready for performance of installation qualification.

Department

PharmaGuide

Q.C.

Q.A.

 

 

 

 

 

 

 

 

 

 

 

 


8. REFERENCE DOCUMENTS

A. Purchase order copy (Annexure – I)

B. Operating and Maintenance manual

Sr. No.

Manual Title

Verified By/Date

1

Operators Guide

 

2

Installation Guide

 

3

Hydro 2000 S/G User Manual

 

4

Sample Dispersion & Refractive Index Guide

 

5

Scirocco User Manual

 

6

Health & Safety

 

7

Compressor Operating Manual

 

8

Site Requirements

 


C. Software Details

Sr. No.

Manual Title

Verified By/Date

1

Mastersizer 2000 PSS0002-18

 

2

Mastersizer 2000 PSS0018-01

 

3

Mastersizer 2000 PSS0010-04

 

4

Acrobat 7.0 Standard

 

5

Floppy for linearity files (System Sr. No. MAL101428)

 



9. INSTALLING SOFTWARE
Use the following procedure to install Mastersizer 2000 version 5.22

Sr. No.

Specification

Checked by & Date

1

Insert the Software CD into CD-Drive

 

2

CD autorun.

 

3

Follow the screen command for installation

 

4

After successful installation of software, it will display a message saying installation is complete

 


10. INSTALLING MACHINE IN SOFTWARE

SELECTING COM PORT (RS232-C SERIAL COMMUNICATION PORT) AND CONNECTING TO MACHINE

Sr. No.

Specification

Checked by & Date

1

Click on installation on main menu bar then click on COM Port.

 

2

Communication port number window will appear. By Default, communication port number is 1. If serial communication port 1 is free and available then click cancel or else type the serial communication port number that is free and then click ok.

 

3

Now Connect the RS-232-C cable of communication port to the instrument.

 

4

When instrument is connected all the instrument function enables in the software.

 



CONFIGURING SECURITY

Sr. No.

Specification

Checked by & Date

1

Security configuring using Configure - Security Manu.

 

2

You can allow the different level of access of software to different user.

 



SETTING COMPANY NAME

Sr. No.

Specification

Checked by & Date

1

Company name is printed on the printouts taken from the software. Default company name is Malvern Instruments.

 

2

Company name can be change by modifying the report page or making new report from tools - report designer.

 


Printer for Printing Data:

Description

Specification

Actual

Checked by & Date

Type

HP LaserJet

 

 

Connected to

Local PC / Network Printer

 

 


Installation verification

Consideration

Yes/No

Checked by / Date

Software installed successfully to PC

 

 

Sufficient free space of 15MB is available on Hard disk

 

 

Electrical connections have been done according to the drawing

 

 

Required electric connections are tight and proofed and grounded.

 

 


11. SYSTEM DESCRIPTION
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

12. MAJOR COMPONENT LIST
Identify all the major components and their specification.

Sr. No.

Name of Components / Accessories

Specified Serial No.

Actual

Verified By/ Date

1

Mastersizer 2000 Optical Bench


 

 

2

Hydro 2000 S Small volume auto dispersion unit


 

 

3

Scirocco 2000 automated dry dispersion unit


 

 

4

Vacuum Collation System


 

 

5

Air Compressor

 

 


13. IDENTIFICATION OF INSTRUMENTS TO BE CALIBRATED
Identify and enlist the instruments to be calibrated, its location, test instrument to be used to calibrate the instrument & its location. This should be signed by along with the date by the engineer.

Sr. No.

Instrument to be calibrated

Location

Test instrument

Identified by & date

1

NA

NA

NA

 



14. CHECK FOR INSTALLATION QUALIFICATION
A. Physical observation

Item

Requirement

Observation

Verified by / Date

Equipment Appearance check

No Defragmentation, Damages etc.

 

 

Part check

Check with standard packing list and confirm that parts are supplied as listed

 

 

Installation site check

Check and confirm the following

 

 

Room Temperature of 15°C to   35°C

I

:-

 

II

:-

III

:-

Humidity of 45% to 70%

 

I

:-

II

:-

III

:-

Firm, vibration free location, as     level as possible.

 

 

Stability of input power (< ± 10% of 230 V AC 50 Hz with MCB)

I

:-

II

:-

III

:-

Platform level 

 

 



B. Apparatus
INSTRUMENT IDENTIFICATION

Sr. No.

Particular

Observation / Requirement

Verified by / Date

1

Equipment Name

 

 

2

Manufacturer

 

 

3

Model

 

 

4

Serial Number

 

 

5

Power

 

 

6

Frequency

 

 

7

Power Consumption

 

 



EXPENDABLES / CONSUMABLES

Sr. No.

Description

Part No.

Verified by / Date

1

450mm cell inlet/outlet tube

 

 

2

Lens tissues

 

 

3

Pair of cell windows and seals

 

 

4

Quality audit standard

 

 

5

Quality audit standard

 

 

6

Vacuum bags

 

 


15. SOP IDENTIFICATION

Sr. No.

Particulars

Title of SOP

SOP No.

1.

Operation

 

 

2.

Cleaning

 

 

3.

Preventive maintenance

 

 

4.

Calibration

 

 


16. PREVENTIVE MAINTENANCE PROGRAMME
Preventive maintenance schedule has been prepared and this has to be observed by the Malvern.  This has been made based on the recommendation of the Malvern & the user of the equipment.

17. CHANGE PARTS AND SPARE PARTS
Identify and enlist the change parts and spare parts (Expendables/Consumables) for the each module of the equipment.

18. SAFETY FEATURES IDENTIFICATION
Identify all safety features of the equipment, their specified function. Sign the document (By the engineer).

Sr. No.

Safety feature

Function

Identified by / Date

1.

 

 

 


19. REQUALIFICATION CRITERIA
The equipment shall be subjected to installation requalification only under following reasons:
  • Change in location of the equipment.
  • Shifting out of the equipment for major maintenance or modification & again locating at the same place after completion of work.


20. DEFICIENCY AND CORRECTIVE ACTION REPORT

DEFICIENCY OBSERVED (IF ANY)
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________


CORRECTIVE ACTION TAKEN AND CONDUCTED BY
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________


CONDUCTED BY: __________          DATE : __________

AUTHORIZED BY: __________          DATE : __________

21. SUMMARY & CONCLUSION

SUMMARY :
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________


CONCLUSION :
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________


COMMENTS :
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________


22. INSTALLATION QUALIFICATION POST – APPROVAL
Q.C. Head and Q.A Head will review the executed protocols and will be authorized to approve the equipment for operational qualification.

APPROVED / NOT APPROVED

Name

Designation

Signature

Date

 

 

 

 

 

 

 

 

 

 

 

 


23. APPENDIX
List of Annexures
Enlist all the annexures to be attached with the protocol.
ANNEXURE-1: Purchase order copy

Abbreviations
Enlist all the abbreviation and their full form used in the Installation Qualification protocol.
Q.C: Quality Control
Q.A: Quality Assurance

Post a Comment