- Protocol Author
- Protocol Pre – Approval
- Validation Team
- Objective & Scope
- Acceptance Criteria
- Responsibilities
- Criteria For Clearance to Installation Qualification
- Reference Documents
- Installing Software
- Installing Machine in Software
- System Description
- Major Component List
- Identification of Instruments to be Calibrated
- Check For Installation Qualification
- SOP Identification
- Preventive Maintenance Programme
- Change Parts and Spare Parts
- Safety Features Identification
- Requalification Criteria
- Deficiency and Corrective Action Report
- Summary & Conclusion
- Installation Qualification Post – Approval
- Appendix
Name |
Designation |
Signature |
Date |
|
|
|
|
Name |
Designation |
Signature |
Date |
|
|
|
|
|
|
|
|
|
|
|
|
Function |
Name |
Signature |
Date |
|
|
|
|
|
|
|
|
|
|
|
|
- The equipment is installed according to the design specification and manufacturer’s recommendation.
- Each installed subcomponent complies with the specifications.
- SOP’s have been identified and listed.
- All critical instrumentation have been identified for calibration.
- The equipment shall be installed as per the supplier’s recommendation.
- The installation shall be performed in the close supervision of the validation team.
- All checks of installation qualification shall be found to be in accordance with the desired requirement as mentioned in the specifications for the equipment.
- Protocol Development: Representative of Malvern in close co ordination with Q.C. and Q.A. shall develop the protocol.
- Qualification Program: This has been jointly carried out by Q.C., Q.A. & Representative of Malvern.
- Approval of Protocol & Evaluation of Results for Final Approval: The Q.C Head and Q.A Head will evaluate the results and are authorized for final approval.
PARAMETERS |
REQUIREMENT |
OBSERVATION |
CHECKED BY |
DATE |
® A copy of the duly
raised purchase order
® Check the list of accessories
and spares |
Should be available
As per purchase order |
|
|
|
PARAMETERS |
CHECKED BY |
DATE |
Machine shall be received from the vendor at the factory. All
details of delivery shall be checked.
Machine shall be then shifted to the location where it has to be
installed in Q.C. department.
Validation team in the presence of a person from the supplier shall
perform installation qualification of the equipment.
Utilities should be identified and then connected to the
equipment. |
|
|
Department |
PharmaGuide |
Q.C. |
Q.A. |
|
|
|
|
|
|
|
|
|
|
|
|
Sr. No. |
Manual Title |
Verified By/Date |
1 |
Operators
Guide |
|
2 |
Installation
Guide |
|
3 |
Hydro
2000 S/G User Manual |
|
4 |
Sample
Dispersion & Refractive Index Guide |
|
5 |
Scirocco
User Manual |
|
6 |
Health
& Safety |
|
7 |
Compressor
Operating Manual |
|
8 |
Site
Requirements |
|
Sr. No. |
Manual Title |
Verified By/Date |
1 |
Mastersizer
2000 PSS0002-18 |
|
2 |
Mastersizer
2000 PSS0018-01 |
|
3 |
Mastersizer
2000 PSS0010-04 |
|
4 |
Acrobat
7.0 Standard |
|
5 |
Floppy for linearity files (System Sr. No. MAL101428) |
|
Sr. No. |
Specification |
Checked by & Date |
1 |
Insert the Software CD into CD-Drive |
|
2 |
CD autorun. |
|
3 |
Follow the screen command for installation |
|
4 |
After successful installation of software, it will display a message
saying installation is complete |
|
Sr. No. |
Specification |
Checked by & Date |
1 |
Click on installation on main menu bar then click on COM Port. |
|
2 |
Communication port number window will appear. By Default,
communication port number is 1. If serial communication port 1 is free and
available then click cancel or else type the serial communication port number
that is free and then click ok. |
|
3 |
Now Connect the RS-232-C cable of communication port to the
instrument. |
|
4 |
When instrument is connected all the instrument function enables in
the software. |
|
Sr. No. |
Specification |
Checked by & Date |
1 |
Security configuring using Configure - Security Manu. |
|
2 |
You can allow the different level of access of software to different
user. |
|
Sr. No. |
Specification |
Checked by & Date |
1 |
Company name is printed on the printouts taken from the software.
Default company name is Malvern Instruments. |
|
2 |
Company name can be change by modifying the report page or making
new report from tools - report designer. |
|
Description |
Specification |
Actual |
Checked by & Date |
Type |
HP
LaserJet |
|
|
Connected
to |
Local PC
/ Network Printer |
|
|
Consideration |
Yes/No |
Checked by / Date |
Software installed successfully to PC |
|
|
Sufficient free space of 15MB is available on Hard disk |
|
|
Electrical connections have been done according to the drawing |
|
|
Required electric connections are tight and proofed and grounded. |
|
|
Sr. No. |
Name of Components / Accessories |
Specified Serial No. |
Actual |
Verified By/ Date |
1 |
Mastersizer 2000 Optical Bench |
|
|
|
2 |
Hydro 2000 S Small volume auto dispersion unit |
|
|
|
3 |
Scirocco 2000 automated dry dispersion unit |
|
|
|
4 |
Vacuum Collation System |
|
|
|
5 |
Air Compressor |
|
|
Sr. No. |
Instrument to be calibrated |
Location |
Test instrument |
Identified by & date |
1 |
NA |
NA |
NA |
|
Item |
Requirement |
Observation |
Verified by / Date |
|||
Equipment Appearance check |
No Defragmentation, Damages etc. |
|
|
|||
Part check |
Check with standard packing list and confirm that
parts are supplied as listed |
|
|
|||
Installation site check |
Check and confirm the following |
|||||
|
Room Temperature of 15°C to 35°C |
I |
:- |
|
||
II |
:- |
|||||
III |
:- |
|||||
Humidity of 45% to 70%
|
I |
:- |
||||
II |
:- |
|||||
III |
:- |
|||||
Firm, vibration free location, as level as possible. |
|
|
||||
Stability of input power (< ± 10% of 230 V AC 50
Hz with MCB) |
I |
:- |
||||
II |
:- |
|||||
III |
:- |
|||||
Platform level |
|
|
Sr. No. |
Particular |
Observation / Requirement |
Verified by / Date |
1 |
Equipment
Name |
|
|
2 |
Manufacturer |
|
|
3 |
Model |
|
|
4 |
Serial Number |
|
|
5 |
Power |
|
|
6 |
Frequency |
|
|
7 |
Power Consumption |
|
|
Sr. No. |
Description |
Part No. |
Verified by / Date |
1 |
450mm cell inlet/outlet tube |
|
|
2 |
Lens tissues |
|
|
3 |
Pair of cell windows and seals |
|
|
4 |
Quality audit standard |
|
|
5 |
Quality audit standard |
|
|
6 |
Vacuum bags |
|
|
Sr. No. |
Particulars |
Title of SOP |
SOP No. |
1. |
Operation |
|
|
2. |
Cleaning |
|
|
3. |
Preventive
maintenance |
|
|
4. |
Calibration |
|
|
Sr. No. |
Safety feature |
Function |
Identified by / Date |
1. |
|
|
|
- Change in location of the equipment.
- Shifting out of the equipment for major maintenance or modification & again locating at the same place after completion of work.
Name |
Designation |
Signature |
Date |
|
|
|
|
|
|
|
|
|
|
|
|