- To demonstrate the operational capabilities of Air compressors
- To ensure that air compressor is operating as intended and is under state of
- Operational features to meet process requirements and equipment specifications.
Name |
SOP number |
Set-up
& Operation SOP |
|
Cleaning
SOP |
|
Description |
Specified |
Remark |
Checked By |
‘ON’
switch |
Should
start the System |
Yes |
|
‘OFF’
switch |
Should
stop the System |
Yes |
|
Startup
sequence |
Not
specified |
|
|
Operational Description |
Specified |
Remark |
Checked By |
Pressure switch –for oil pressure |
Shall maintain set point |
Yes |
|
Auxiliary valve |
Shall maintain set for loading and unloading |
Yes |
|
Safety valves |
Shall control at set point. |
Yes |
|
- Measure and record the air pressure at the air receiver tank.
- Monitor the reading after stabilization.
SR. NO |
LOADING TIME |
PRESSURE OBSERVED (Kg/ sq cm) |
REMARKS |
1 |
4 min |
10 |
OK |
2 |
4min |
10 |
OK |
3 |
4min |
10 |
OK |
- Air compressor unit is to be in continuous operations when the test is being performed.
- All the end valves must be closed
- Record the loading time and unloading time continuously at air receiver tank for certain period.
Sr. No |
Unload Time(sec) |
Load time (sec) |
Remarks |
1 |
3min 30sec |
4min |
OK |
2 |
3min 30sec |
4min |
OK |
3 |
3min 30sec |
4min |
OK |
- Put the system under pressure up to 100psig for 2hrs.and check for any pressure drop in order to identify the leakage from the chamber.
- Prepare the soap solution and apply near the joints.
- Observe the pressure drop every 15 minutes and record in the observation table.
Sr. No |
Time in min. |
2 Standard Pressure (kg/cm) |
Pressure Drop 2 (kg/cm) |
Checked by |
1. |
15 |
9 |
0 |
|
S. No. |
Specifications |
Actual |
Probable reasons |
Checked by |
1. |
Not in line with acceptance criteria |
None |
None |
|
S. No. |
Correction Done |
Done by |
Checked by |
1. |
|
|
|
S. No. |
Description of conformance |
Checked by |
Remarks |
1 |
Complies with acceptance criteria |
|
OK |
Department |
Name |
Signature |
Date |
Maintenance
|
|
|
|
Production |
|
|
|
Quality
Assurance |
|
|
|
Management
|
|
|
|
FUNCTION |
NAME |
SIGNATURE |
DATE |
Engineering |
|
|
|
Production |
|
|
|
Quality
Assurance |
|
|
|